Built from the Off-Mains deck (44 slides). Cross-links into the Percolation course and the GBR regulatory reference.
Modules
Septic Tanks
Tank construction (brick, concrete, fibreglass, plastic), dip and H pipes, baffle failure, sludge build-up causing soakaway blockage.
Start moduleSewage Treatment Plants
Klargester BioFicient, BioDisc, primary settlement, biological zones, final settlement. Reed beds and pumping stations.
Start moduleSoakaways, Drainage Fields & Percolation
Drainage field sizing, perforated pipe construction, percolation test method (BS 6297), Vp calculation.
Start moduleGeneral Binding Rules
Existing vs new discharge, capacity limits (2 m³/day to ground), British Standards (BS EN 12566, BS 6297:2007), maintenance requirements.
Start module